RT1 project

I decided to go with a painted finish on the cases, using Dupli-Color DE1615 aluminum. Next the bearings went into the freezer overnight and I heated the cases in the oven and installed them. This also helped to cure the paint.
100_1483

Here the six case bearings are installed. After this I put the case halves together and measured the main bearing width on the inside, and measured the crankshaft width at the bearing contact area. There is a shim that goes on the right side of the crankshaft that needs to be roughly half the difference of the two measurements to center it. The shim that came out of the engine was just right with the new bearings.
100_1498

The transmission was in excellent shape, just needing to be disassembled and cleaned.
100_1502

Here the crankshaft is being pulled into the right side main bearing.
100_1504

Then the transmission goes in. After this the case mating surfaces are cleaned and sealer is applied using a small modelers paint brush.
100_1509

Here the left side case is going on by pulling the crankshaft into the left side main bearing, making sure the transmission shafts line up.
100_1512

The cases are back together.
100_1516